No Water Supply System in Kot Addu
Est. Solid Waste generation = 57.14TPD Avg. Solid Waste disposal = 85.28 TPD Disposal efficiency =67.01%.
Fully served area: 479 Un served area: 1104 Flooded area: 579
Total Number of Roads = 9 Total Length of Roads = 25(KM)
Total Number of Street Light = 1901Working Street Light = 1141(60%)Not Working Street Light =760(40%)
Total Number of Parks in the city = 5Major facilities available in Parks Swings, Walking track,Lights, ,Filteration Plant